Building permit leads for roofing contractors
Commercial and residential roofing contractors: re-roof and replacement work, new-construction roofing packages, and HOA/multifamily programs, mapped address by address. PermitFeed reads every commercial filing across six SoCal counties nightly and scores each one specifically for roofing contractors: your trade’s rubric, your trade’s priorities, delivered with a written outreach angle.
What our Roofing rubric watches for
Every filing is scored against themes that matter to your book of business, not construction size alone.
Recent qualified leads for roofing contractors
Scored 0.5+ for this trade in the last 90 days. Full records include the address, applicant, source portal link, and a written outreach angle.
| Lead | City | Type | Value | Score |
|---|---|---|---|---|
| ···· Dove St · 180·Sq Reroof – Pitched & Flat LAST NIGHT | Newport Beach | REMODEL | · | 0.95 |
| 4·Story, 24·Unit Apartment Building · New Construction Roofing LAST NIGHT | Los Angeles | NEW_CONSTRUCTION | $10.0M | 0.90 |
| ···· W Venice Blvd · 6·Story Modular Housing Roofing LAST NIGHT | Los Angeles | NEW_CONSTRUCTION | $6.5M | 0.90 |
| ···· N Hoover · 2·Story Residential Treatment Facility · New Roofing LAST NIGHT | Los Angeles | NEW_CONSTRUCTION | $5.0M | 0.90 |
| ···· N Commonwealth Ave · New 2·Story Residential Treatment Facility LAST NIGHT | Los Angeles | NEW_CONSTRUCTION | $5.0M | 0.90 |
| Crenshaw Blvd · Tap Room & Test Kitchen New Build LAST NIGHT | Los Angeles | NEW_CONSTRUCTION | $430K | 0.90 |
What one more commercial re-roof is worth
Back-of-napkin arithmetic, on purpose: your win rate and your margins are yours. The feed’s job is at-bats you would not have seen, weeks earlier than you would have seen them. One landed commercial re-roof tends to settle the question.
Timing is the whole product
Commercial re-roofs print the square footage on the permit, and owner-pulled filings usually mean direct award. The feed reads both, nightly, before the chase gets crowded.
How the signal reads for roofing contractors
On commercial work the square footage is the bid, and it is printed on the permit. A 200,000-foot tear-off is a seven-figure award sitting in public record, and when the owner pulls the permit instead of a general contractor, that usually means a direct award and a shorter chase. Residential re-roofs file after the roofer already sold the job, so we map them for territory share and leave the bidding to the filings that deserve it: portfolios, HOAs, schools, and every new roof that ships solar-ready.
Portfolios re-roof in waves
REITs, school districts, and HOAs fund roofing in cycles: bond measures and reserve studies turn into batches of filings, often a dozen buildings in a season under one owner. Catch the first filing in a wave and you are early to the other eleven. Title 24's cool-roof requirements ride along on commercial re-roofs, which moves the spec conversation upstream, where the contractor who raises it first looks like the expert.
Solar makes roofs bid twice
Every commercial array needs a roof that can carry twenty-five more years, and every serious solar contractor needs a roofing answer before the racking lands. A PV filing at an address with an aging roof is two contracts wearing one permit. Watch the solar lens beside your own and the partnership calls make themselves.
The scale behind that: 27,827 filings tracked across six Southern California counties in the last twelve months, carrying $2.3B in declared construction value, every one read against a rubric written for roofing contractors. The handful that belong in your pipeline surface. The rest sink.
The national construction-data platforms aggregate these same public records on a slower cycle, fold them into fifty states of noise, and price by custom quote. We collect from the source portals every night, read SoCal only, score for roofing contractors specifically, and post our prices: $59 to $499 a month, cancel from your own account page.
Field notes for roofing contractors
- Cedar gone grey: what a Bungalow Heaven reroof is allowed to beCedar and redwood shakes come off Pasadena's Craftsman bungalows grey and split along the grain, and the statute governing what goes back on keys to a
- Class A on a bare lot: a roofing market measured in yearsA Class A roof assembly cannot go on until something is standing under it, and seventeen months after the Palisades and Eaton fires Los Angeles County
- Three or four inches of polyiso: the reroof requirement that movedOn the prescriptive path, a low-sloped commercial membrane has to hold an aged solar reflectance of 0.63, and Title 24 has asked for that number since
- Built-up roofing, off in phases: what a reroof permit line commitsA built-up roof at 3210 Merryfield Row is coming off in phases, and the permit that records it carries 536 characters of scope text naming a phase, a
Three patterns that keep paying
The owner-pulled tear-off
When the property owner files the re-roof directly, there is no GC gatekeeping the award. Shortest distance between a permit and a contract in the trade.
The portfolio wave
REITs and districts fund roofs in batches: one filing under an owner's name is often the first of a dozen. Early to the first, early to all twelve.
The solar tell
A commercial PV filing on a twenty-year-old roof is a re-roof that has not bid yet. The array cannot land until you do.